6386452b-59fa-4010-b5a4-c15bd2efe877.jpg

Grid • Al Khafji Joint Operations Company

On-Site Loop Check for Khafji Crude Plant

We successfully executed on-site loop-checking activities at the Khafji Crude Plant as part of preventive and corrective maintenance works for Al Khafji Joint Operations.


The scope was delivered within a live operating environment, ensuring signal integrity, functional performance, and system reliability across critical instrumentation and control loops.

 

Despite tight schedules and shutdown constraints, we completed the activities within the approved maintenance window, restoring full operational capacity, improving loop stability, and reducing recurring alarms. The successful execution reinforced client confidence and further positioned us as a reliable technical partner in the Oil & Gas sector.

Client

Al Khafji Joint Operations Company

Location

Ras al-Khafji, Saudi Arabia

decor

Grid Projects

01
d205b7e5-16ee-41d6-bd89-9544844c6999.jpg

On-Site Loop Check for Jafurah Desalination Project

We provided on-site loop-checking services for the Jafurah Desalination Project, supporting SEPCO Arabia and the consortium of Lamar Holding and Mowah.


Our scope ensured full instrumentation verification, control system integrity, and commissioning readiness for a critical water production facility.

 

Despite complex system integration and compressed timelines, we completed the works on schedule, reducing commissioning risks and enabling a smooth system handover. The project received positive feedback from the client and consortium stakeholders, further validating our capability to support complex infrastructure projects with precision and reliability.

EXPLORE MORE
e17ae8cb-ce24-431e-84d9-6f9857b6437f.jpg

On-Site Calibration for Booster Gas Compression Projects (BGC-3 & BGC-5)

We successfully delivered on-site calibration services for the BGC-3 and BGC-5 Booster Gas Compression Projects in the Central Region, supporting SEPCO Arabia and Saudi Aramco.


Our scope covered a wide range of process and electrical instruments across critical upstream gas compression facilities, using portable reference equipment fully compliant with Saudi Aramco standards and ISO/IEC 17025 requirements.

 

Despite tight schedules and remote site locations, we completed all activities without impacting construction or commissioning timelines. The project enhanced the accuracy and reliability of critical instrumentation across both sites, demonstrating our ability to deliver precision calibration services under demanding field conditions.

EXPLORE MORE
100 MVA Transformer ΓÇô Full Rewinding.jpg

Rewinding of 133 MVA Transformer

Our team successfully executed a complete rewinding of 133 MVA transformers, managed from site to site with precision and expertise.
The scope included the re-engineering of the transformer windings carried out by our highly experienced team.
Both the High Voltage and Low Voltage windings were internally manufactured at our advanced facility, followed by curing using one of the largest Vapor Phase Drying (VPD) systems in the region ensuring optimal insulation performance and quality.
Subsequent activities included the tanking process, assembly, and preparation for Factory Acceptance Testing (FAT).
After successful testing, the transformer was safely transported and installed at the site, ready for reliable grid operation.
We specialize in transformer rewinding and refurbishment for national utilities and industrial power networks and infrastructure.

EXPLORE MORE
;

Solar PV System Design (On-Grid System)

Event Started

Solar PV System Design (On-Grid System)
ati-08.jpg