752 MVA Transformer Replacement Project

Technical Services carried out the replacement of a 752 MVA transformer, which involved dismantling the faulty unit and transporting a new transformer to destination.
The transportation process presented significant challenges due to the complexity of the route and logistical constraints.
Our dedicated team worked 24/7 to ensure the installation of the new transformer. The project scope included all associated work such as cable testing, supply and installation of a new Gas Insulated Busbar (GIB), and commissioning of protection system, and final safe energization.
This achievement reflects our ongoing commitment to reliability, technical excellence, and timely power infrastructure upgrades.

Client

National Grid

Location

Saudi Arabia

decor

Grid Projects

01
d205b7e5-16ee-41d6-bd89-9544844c6999.jpg

On-Site Loop Check for Jafurah Desalination Project

We provided on-site loop-checking services for the Jafurah Desalination Project, supporting SEPCO Arabia and the consortium of Lamar Holding and Mowah.


Our scope ensured full instrumentation verification, control system integrity, and commissioning readiness for a critical water production facility.

 

Despite complex system integration and compressed timelines, we completed the works on schedule, reducing commissioning risks and enabling a smooth system handover. The project received positive feedback from the client and consortium stakeholders, further validating our capability to support complex infrastructure projects with precision and reliability.

EXPLORE MORE
6386452b-59fa-4010-b5a4-c15bd2efe877.jpg

On-Site Loop Check for Khafji Crude Plant

We successfully executed on-site loop-checking activities at the Khafji Crude Plant as part of preventive and corrective maintenance works for Al Khafji Joint Operations.


The scope was delivered within a live operating environment, ensuring signal integrity, functional performance, and system reliability across critical instrumentation and control loops.

 

Despite tight schedules and shutdown constraints, we completed the activities within the approved maintenance window, restoring full operational capacity, improving loop stability, and reducing recurring alarms. The successful execution reinforced client confidence and further positioned us as a reliable technical partner in the Oil & Gas sector.

EXPLORE MORE
e17ae8cb-ce24-431e-84d9-6f9857b6437f.jpg

On-Site Calibration for Booster Gas Compression Projects (BGC-3 & BGC-5)

We successfully delivered on-site calibration services for the BGC-3 and BGC-5 Booster Gas Compression Projects in the Central Region, supporting SEPCO Arabia and Saudi Aramco.


Our scope covered a wide range of process and electrical instruments across critical upstream gas compression facilities, using portable reference equipment fully compliant with Saudi Aramco standards and ISO/IEC 17025 requirements.

 

Despite tight schedules and remote site locations, we completed all activities without impacting construction or commissioning timelines. The project enhanced the accuracy and reliability of critical instrumentation across both sites, demonstrating our ability to deliver precision calibration services under demanding field conditions.

EXPLORE MORE
;

Solar PV System Design (On-Grid System)

Event Started

Solar PV System Design (On-Grid System)
ati-08.jpg